My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL54973
DRMS
>
Back File Migration
>
General Documents
>
GENERAL54973
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:05 PM
Creation date
11/23/2007 9:58:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
General Documents
Doc Date
8/20/1996
Doc Name
CDPS General Permit
From
Stormwater Permit Folder
Permit Index Doc Type
Reclamation Project
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART i Page 13 of 20 <br />Permit No. COR-040000 <br />E. REPORTING REQUIItEMENTS (cont.) <br />3) A summary of the annual inspection reports, including date, fmdings, and action taken, or [he triennial <br />certification by a Professional Engineer (based on an inspection) that the facility is in compliance with the <br />permit. <br />4) Certification language and signamre by the permittee. (See Part LE.2 of the permit.) <br />The report will be due to the Division on or before February 15, 1999 and cover the period of time between the <br />coverage by this general permit and December 31, 1998. The Division reserves the right to require additional <br />information in the report, and more frequent reports, on a case-by-case basis, as needed. <br />c. Annual Report for Remediation Operations: The permittee will be required to submit an Annual Report, <br />covering January 1 through December 31 of each yeaz, on the overall compliance with the SWMP. The Annual <br />Report shall contain, at a minimum: <br />1) Name of permittee, address, phone number, and permit certification number. <br />2) A report on the facility's overall compliance with the SWMP, including a progress report on all <br />remediation activities. <br />3) A summary of each comprehensive stotmwater facility inspection made, including date, fmdings, and <br />action taken. <br />4) Results and interpretation of any stormwater monitoring performed. <br />5) Certification language and signamre by the permittee. (See Part 1.E.2 of the permit.) <br />The report will be due to the Division on or before February 15, of each yeaz. The enact due date for the <br />permittee's first Annual Report will be listed in their permit certification. The Division reserves the right to <br />require additional information in the report, and more frequent reports, on a case-by-case basis, as needed. <br />d. Reporting Address: A signed copy of the above report forms(s) shall be submitted to the following address: <br />Colorado Department of Public Health & Environment <br />Water Quality Control Division <br />WQCD-PE-B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80222-1530 <br />2. Si¢natorv Requirements <br />a. Ail reports required for submittal shall be signed and certified for accuracy by the permittee in accordance with <br />the following criteria: <br />1) In the case of corporations, by a principal executive officer of at least the level of vice-president or his or <br />her duly authorized representaive, if such representative is responsible for the overall operation of the <br />facility from which the dischazge described in the form originates; <br />2) In the case of a partnership, by a general partner; <br />3) In the case of a sole proprietorship, by the proprietor; <br />4) In the case of a municipal, state, or other public facility, by either a principal executive officer, ranking <br />elected official, or other duly authorized employee. <br />Changes to authorization. If an authorization under pazagraph a. of this section is no longer accurate because <br />a different individual or position has responsibility for the overall operation of the facility, a new authorization <br />satisfying the requirements of paragraph a. of this section must be submitted to the Division, prior to or <br />together with any reports, information, or applications to be signed by an authorized representative. <br />c. Certification. Any person signing a document under pazagraph a. of this section shall make the following <br />certification: <br />
The URL can be used to link to this page
Your browser does not support the video tag.