My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL54954
DRMS
>
Back File Migration
>
General Documents
>
GENERAL54954
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:04 PM
Creation date
11/23/2007 9:57:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
General Documents
Doc Date
11/16/1984
Doc Name
REQUEST FOR FORMAL BOARD REVIEW CRS 534-33-119 AND RULE 2.07.4
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
following each identified stipulation. The stipulations are <br />identified in this section of the applicant's request for review <br />in the same numerical order set forth in the proposed decision: <br />Objection No.: Stipulation No./Objections <br />5.1 3. Stipulation #~s to an <br /> obligation on the applicant to <br /> test surface water sites and <br /> alluvial wells. The stipulation <br /> requests testing with a frequency <br /> which is impossible of performance <br /> because of the physical conditions <br /> which occur at the mine site dur- <br /> ing seasonal changes and appears <br /> to require testing beyond the <br /> period of expected operations. <br /> The appliant has proposed a more <br /> specific schedule for sample col- <br /> lection and testing, which takes <br /> into account the physical con- <br /> ditions on site and seasonal <br /> changes, as well as the expecta- <br /> tion that such collecting of <br /> samples and analyses thereof will <br /> provide meaningful data related to <br /> operations. <br />5.2 4. Stipulation #4 relates to <br /> placing of ground water .ells and <br /> then sampling and chemical analy- <br /> ses of such samples. Ground water <br /> wells are already in place at <br /> locations approved by the Divis- <br /> ion. The applicant has proposed <br /> that the testing schedule and the <br /> analyses of samples proposed by <br /> the Division be modified to take <br /> into account physical conditions <br /> on site, including seasonal <br /> changes and the operational <br /> schedule of the applicant so that <br /> such information will provide <br /> meaningful data. <br />5.3 7. Stipulation #7 relates to a <br /> monitoring plan for the success of <br /> revegetation. The applicant has <br /> proposed a more specific monitor- <br /> --2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.