Laserfiche WebLink
~3E~ 12-1952 12~e~7PP1 <br />0 <br />FRCP1 3L~3 415 77=1b <br />• <br />Exhibit ~1 <br />TO S ~_'81C9b <br />F. ~]~ <br />1. Add wood fiber mulch to dried areas of tailings impoundment <br />2. Grade tailings impoundment area <br />3. P.ip tailings impoundment area <br />4. Spread lime at 15 ton per acre <br />5. Apply organic fertilizer to tailings impoundment area <br />A. Apply lime at 5 ton per acre <br />7. Ar.ply chemical fertilizer at 500 pounds per acre <br />F, Seed tailings impoundment area at 40 pounds per acre <br />9. @~pply chemical fertilizer at 250 pounds per acre the first and second <br />years after seeding <br />lO.Plant 30 4 foot Ponderosa Pine trees intermittently over impoundment area <br />11.Plant Gooseberry and Serviceberry shrubs intermittently over impoundment <br />area <br />12.Clean upp and grade ore storage area along west side of mill building <br />13.Spread 3/4 inch roadbase over ore storage area to convert it to parking <br /> Equipment/Labor Material <br />ltem ~~ TimeL ate Amount Cast Amount <br />1. 4 $10 $40. 5T @ $15 $25. <br />%2. 4 $60 $240. <br />3. 2 $60 $120. <br />4. 2 $35 $70. 30T @ $20 $600. <br />5. 2 $35 $70. <br />6. 2 $35 $70. lOT ld $20 $200. <br />7. 2 $35 $70. 1/2T @ $1000 $500. <br />8. 2 $35 $70. 801b. ~~ $2.4 $192. <br />9. 4 $35 $140. 1/4T @ $1000 $250. <br />10. 8 S8 $64. 30 @ $20 $600. <br />17. 8 S8 $64. 40 @ $6 $240. <br />12. 4 $60 $24D. <br />13. 2 $.60 $120. i8T @ $5.5 $99. <br />Totals $1378.00 <br />$2706.00 <br />TOTRL_ P.~J3 <br />