Laserfiche WebLink
Since the permit was reneged in February, 1988, Technical Revisions 16 through <br />23 and Minor Revisions 29 through 36 have been processed by the Division. The <br />nature and status of these are summarized in Section II of this review. <br />All stipulations to the permit have been reviewed, the status of these is <br />presented in Section III of this review <br />Section IV outlines specific items and areas within the permit application <br />(other than those already noted in Section II and III) which are of concern to <br />the Division and require updating or revision. <br />Section II - Revisions to Permit <br />The revisions listed below comprise those modifications of the permit made <br />since its renewal February 9, 1988. <br />TR15 - Hydrologic Monitoring Reduction <br />Su muted Apri approve u y 88. Revised pages 2.04 - 21 through <br />2.04 -31.2 were provided by the operator to be incorporated into the permit. <br />No other action is required. <br />TR16 Stollsteimer Creek Crossing <br />Submittea 27 Apr approve May 88. Revised maps 13A, 13B, 13R and <br />Facilities and Mine Map. No other action is required. <br />TR17 Conclude Subsidence Monitoring <br />Submitte 6 Jun approve 2 Aug 88. Revised Map 2. No other action is <br />required. <br />TR18 Implacement of Riprap in Temporary Ditch <br />Su mute 2 Aug approve p T e four pages of calculations <br />should be incorporated into the permit. <br />TR19 Eliminate Hydrologic Monitoring <br />Su mute r pprove ay <br />TR20 Sediment Control Plan <br />Su mitten May approved 31 Aug 90. Text and calculations should be <br />incorporated as revised pages into existing permit. Map 7A revised 2 July 90. <br />TR21 Revegatation Standards/Land Use Change <br />Su muted 30 Ju y 0, approve wi stipu ations 17 & 18,. 3 Dec 90. Revised <br />Land Use Map IARI, Vegetation Map 2R1. Appropriate pages in the permit should <br />be updated to include the revised data <br />TR22 Change in Revision 1 Area Backfilling Plan <br />Su muted 24 Sep approve 2 Sep Appropriate pages in the permit <br />should be revised to reflect the approved changes and a certified copy of the <br />final topography map is still required. <br />TR23 Change Embankment Design Pond 3 <br />Submitte 2 Oct approve Nov 90. Appropriate pages in the permit <br />should be revised and incorporated to reflect to approved changes. <br />_4_ <br />