My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-04-08_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
1991-04-08_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2021 1:40:09 PM
Creation date
11/23/2007 9:51:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
4/8/1991
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Midterm Review <br /> Trapper Mine <br /> (C-81-010) <br /> This document presents the results of the Division 's Midterm Review of the <br /> Trapper Mining, Inc. , Trapper Mine Permit. This Midterm Review was conducted <br /> to fulfill the requirements of Rules 2.08.3, 2.06.2(10), 2.06.3(4), 2.06.7(5) <br /> and 3.02.2(4) . <br /> Rule 2.08.3 requires that the Division conduct a review of each permit issued, <br /> prior to its Midterm (2-1/2 years). Based on this review, for good cause <br /> shown, the Division may require reasonable revisions or modifications of the <br /> permit provisions to ensure compliance with the Act and Regulations. <br /> Rules 2.06.2, 2.06.3, 2.06.5 and 2.06.7 require that experimental practices , <br /> mountain top removal variances , variances form approximate original contour <br /> (AOC) and variances from contemporaneous reclamation, respectively, be <br /> reviewed by the Division where applicable during the Midterm Review. <br /> Rule 3.02.2(4) requires that the Division review the amount of the bond and <br /> the terms of acceptance of the bond every 2-1/2 years. <br /> This Midterm Review consisted of a detailed review of the Apex No. 2 Mine <br /> permit application and Findings Document to identify any items that may have <br /> been overlooked during the initial review. The Division also reviewed all <br /> subsequent revisions and stipulation responses to ensure that all permit <br /> commitments and conditions were being followed. Problems and observations <br /> from past inspection reports were also considered. <br /> -1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.