My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL54813
DRMS
>
Back File Migration
>
General Documents
>
GENERAL54813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:58 PM
Creation date
11/23/2007 9:50:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
General Documents
Doc Date
3/9/1987
Doc Name
CORRECTION TO MARR MINE INSPECTION REPORT DATED 2/26/1987 FN C-80-006
From
KERR COAL CO
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BEFORE THE MINED AND <br />DEPARTMENT OF NATURAL <br />STATE OF COLORADO <br />Settlement Agreement <br />RECLAMATION BOARD <br />RESOURCES <br />------------------------------------------------------------------------------- <br />IN RE: Kerr Coal Company -- <br />Review of Mined Land Reclamation Division's <br />Proposed Reclamation Bond for the Marr Strip Mine <br />Permit No. C-80-006 <br />------------------------------------------------------------------------------- <br />The Mined Land Reclamation Division ("the Division") of the Colorado <br />Department of Natural Resources and Kerr Coal Company ("Kerr") hereby enter <br />into a Settlement Agreement in the above captioned matter. <br />Findings of Fact and Agreement <br />1, On October 2, 1986 tht Division proposed a detisicn that Karr -~st 'n <br />E8,850,000 total reclamation bond for the Kerr Marr Strip Mine, <br />2. On October 24, 1986 Kerr requested a Formal Board Hearing to contest <br />the facts and methods employed by the Division to estimate the Marr <br />Strip Mine reclamation cost. <br />3. On November 21, 1986 a Formal Board Hearing was held and the matter was <br />continued to the March 25-26, 1987 Board meeting pending completion of <br />discovery and hearing preparation in accordance with the schedule <br />approved by the Board. <br />4, On December 19, 1986 James T. Cooper, Vice President of Kerr, David <br />Gossett, Chief Mining Engineer of Kerr, David C. Shelton, Director of <br />the Division and Fred Banta, Supervisor of the Coal Program for the <br />Division met to discuss possible means for resolving the dispute. <br />5. On January 15. 1987 the parties identified in 4) above met and agreed <br />to undertake structured discussions to review ,)olntly the facts and <br />assumptions pertaining to the reclamation cost estimate. <br />6. On January 21, 1981 all the parties identified in 4) above met to <br />examine the reclamation cost estimate. Subsequent meetings took place <br />on January 23, 1987, January 27, 1987 and January 28, 1987 between Fred <br />Banta and David Gossett to examine further the facts and assumptions. <br />On February 11, 1987 all the parties met again to examine the <br />recalculation of the r~eclamatian cost estimate. The examination <br />resulted in agreements pertaining to significant facts and assumptions <br />within the following parts of the reclamation cost estimate: <br />a. The method for calculating equipment ownership costs; <br />
The URL can be used to link to this page
Your browser does not support the video tag.