My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL54784
DRMS
>
Back File Migration
>
General Documents
>
GENERAL54784
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:57 PM
Creation date
11/23/2007 9:48:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992017
IBM Index Class Name
General Documents
Doc Date
5/22/1997
From
DMG
To
MONTROSE CNTY ENGINEER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ _ _ __ _ _ _ .. . _ . , ,s. >. ....... <br />BLM West End Pit M-92-O17 <br />* A surveyed Plat of this site was submitted with your letter, indicating that the excavated <br />area is 4.6 acres. The permitted boundary illustrated on the Plat measures 9.56 acres, <br />exc}uding the (approximately 1 acre) topseil steekpile located northwest of the permit <br />boundary. The site is permitted for 9.65 acres. <br />* it is indicated that a TeehniealRevision is forthcoming; please-see-number-6, below. <br />* Boundary markers will be located closer to one another and made more visible. <br />* The topsoil stockpileswilFbegraded-andvegetate~ <br />* Sediment control structures will be installed to protect areas outside the affected ]and <br />from slides or other damage. <br />CLARIFICATIONS REQUESTED <br />6. What is the "affected land" acreage, as defned in-Rule number 1. }(3) ? <br />7. Please note chat topsoil muse be included in the permitted area as affected land. Please <br />revise the permit boundaries to indudeihe-topsoitas well as other material <br />stockpiles. <br />8. Please respond to the request that dust emissions comply with the limitations specified <br />in your Air Pollution Control Division Permit. <br />9. Your letter indicated that a Technical Revision for the BLM/West End pit will be <br />forthcoming. Is this in response [o the presence of the asphalt batch plant? <br />10. Have you contacted the BLM about their concerns regarding the location of the asphalt <br />batch plant? This issue should be resolved and documented prior to submitting a <br />Technical Revision regarding the location of the batch plant. <br />11. Please respond to our concern regarding the need for vessel(s) containing hazardous or <br />toxic materials to be stored in an impermeable structure of adequate size to contain the <br />volume of the vessels therein, as potential leakage of failure may affect groundwater. <br />Pursuant to Rule 3.1.7(2)(c)(I), we requested that you propose permit conditions that will <br />protect groundwater uses. <br />
The URL can be used to link to this page
Your browser does not support the video tag.