Laserfiche WebLink
Proof of resolution should be submitted to the Colorado Division of Minerals & Geology as soon <br />as it becomes available <br />Stipulation No. 8 <br />Approval of Permit Revision No. 4 for the Bowie No. 2 Mine is conditioned upon the resolution <br />of the following: <br />1) Violations and forfeitures under the Pinson Settlement: <br />a) Virginia forfeitures for permit numbers 1200724, 2339, 2503, 3053-U, 3394 and 1200551, <br />b) Virginia violations numbers C80-OO1-018-004 and C80-001-018-005, <br />c) West Virginia forfeitures for permit numbers U035700 and U074400. <br />Proof of resolution must be submitted to the Colorado Division of Minerals & Geology as soon <br />as it becomes available. <br />Stipulation No. 9 <br />A detailed subsidence study for Terror Creek Reservoir dam (Bruce Pazk dam) will be completed <br />and approved prior to mining within one mile of the dam. The study will establish baseline <br />conditions, potential mining induced seismicity and potential translated effects to the dam. <br />By September 1, 2001, Bowie Resources will submit a technical revision to the permit <br />addressing the investigation, data collection, analysis, and monitoring plan to ensure the safety <br />and integrity of the Terror Creek Reservoir dam (Bruce Park dam). The revision materials will <br />include, but not be limited to, data, a technical report, compliance schedules, a subsidence <br />control plan, a detailed monitoring plan specific to potential seismicity and any other potential <br />impacts induced by longwall mining. In addition, the specific compliance dates and measures <br />will be the following: <br />July 1, 2001 -Complete the drilling program, as referenced in the Colorado Division of <br />Water Resources letter to the Division, dated February 9, 2001, including installation of <br />piezometers or other down-hole instrumentation. <br />2. September 1, 2001 -Submit the results of the investigation and seismic evaluation of the <br />structure. including recommendations for any additional instrumentation, with the above- <br />referenced technical revision for Division review and approval. <br />3. November 1, 2001 -Install any additional instrumentation in accordance with the final <br />instrumentation plan approved in the above-referenced technical revision. <br />4. Gather all baseline data as required in the above-referenced technical revision, before mining <br />proceeds within a 1 mile radius of the dam. <br />