My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL54737
DRMS
>
Back File Migration
>
General Documents
>
GENERAL54737
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:55 PM
Creation date
11/23/2007 9:46:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
2/27/2001
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR PR4
From
Start Longwall Mining in D-Seam (Iron Point Tract)
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. The Division does not propose to approve alternative procedures for topsoil <br />protection (4.06.1(2)). <br />B. The Division waived the requirement for clearing of small shrub and grass-type <br />vegetation cover prior to topsoil removal. The applicant has demonstrated that <br />inclusion of vegetation cover in salvaged topsoil is not detrimental to soil <br />productivity consistent with the post-mining land use. Large tree and shrub <br />vegetation was removed prior to topsoil salvage. <br />C. The Division has determined that the 'A' and 'B' hori2ons shall be removed <br />together and replaced, in order to ensure soil productivity consistent with the <br />approved post-mining land use (4.06.2(3)). <br />D. The Division has not determined that selected overburden materials shall be used <br />for or as a supplement to topsoil. (4.06.2(4) (a)). <br />V. Sealing of Drilled Holes and Underground Openings <br />A. The applicant has not proposed to manage development, exploration, drill or bore <br />holes, wells or other exposed underground openings in a manner other than by <br />sealing and plugging (4.07.1). <br />B. The Division will require that each hole, well or other underground opening be <br />capped, scaled, backfilled, or otherwise properly managed (4.07.3). <br />VI. Use of Explosives <br />A. The Division does not propose to approve a blasting area in excess of 300 acres <br />(4.08.3(2)(b)(i)). <br />B. The Division does not propose to approve blasting at times other than those <br />described in the blasting schedule (4.08.3(2)(b)(v) and 4.08.4(2)). <br />C. The applicant has not proposed to conduct blasting less than 1000 feet from a <br />school, church, hospital, or nursing facility, or less than 500 feet from disposal <br />wells, petroleum or gas storage facilities, municipal water-storage facilities, <br />fluid-transmission pipelines, gas or oil collection lines, or water or sewage lines <br />(4.08.4(7)). <br />D. The Division is not proposing to approve the use of a modified equation to <br />determine maximum weight of explosives per delay (4.08.6(2)). <br />~g <br />
The URL can be used to link to this page
Your browser does not support the video tag.