Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />~~~ <br />~~~~ <br />_S_an Luis_P_ro'ect News <br />1Vinter 1989-90 Information on the San Luis Project. Costilla County, Colorado <br />SAN LUIS PROJECT UPDATE <br />Building Construction Nearing Completion <br />Building construction has been <br />moving ahead at the San Luis Project. We <br />have Focused on building construction this <br />loll and nn into the winter. <br />But we also have been active in <br />reclamation, soil conservation, and <br />preparing to stuff our mining operation <br />over the next I X months. Here are some of <br />the details. <br />Buildings. In late summer. Battle <br />Mountain Gold contracted with TIC, z <br />Colorado contractor to build three <br />buildings at the plain site, and TIC has <br />been making good progress. The buildings <br />are the combination maintenance shop and <br />warehouse. the office and the lab. <br />TIC has put up the structural steel rm <br />all three buildings. The "skin." or outer <br />wall covering, is complete on the office <br />and un the lab and is (r$ percent complete <br />on the shop-warehouse building. The <br />office and lab are being drv-walled inside. <br />while the .kin is being linished on the <br />shop. <br />Durim_ the past several weeks, the <br />contractor has had 20 to IS employees on <br />the sits. including several local residents. <br />Soil Conservation. Erosion of the <br />county road by the Rito Seco Creek has <br />been around since long betitre Battle <br />Mountain came to this area. However. our <br />work here is giving us the opportunity to <br />help rontrul the pnthlem. <br />In ruuperation with the Soil Conser- <br />vation Sen~ice (SCSI, we have identified <br />nine contort channels that cross the roomy <br />road. The SCS has surveyed them and cal- <br />culated the proper sites for culverts. and <br />Bartle Mountain will bur the cul+erts and <br />hire a rnntractor to install them. <br />Culverts will :dluw ,trcam flow's to <br />pass under instead oFcutting into the road. <br />We will in>tall riprap m;uerial at the <br />culvert discharge w slow the water <br />velocity. This will slow down erosion and <br />protect water quality in the creek. <br />Personnel Development. Battle <br />Mountain plats to employ up to 90 <br />persons withit the next 18 momhs, and we <br />are cooperutine with two local oreaniza- <br />tions to make sure that Costilla County <br />residents are yell represented. <br />We have established standards which <br />job seekers must meet to be considered for <br />employment ;tt the San Luis Project. The <br />standards emphasize eighth-grade level <br />skills in math and English. In addition, <br />Battle Mount.tin has a random drug <br />screening pro:ess in place which applies <br />to current and future employees. <br />Pre-application screening of persom <br />inurested in : pplying for jobs at the San <br />Luis Project +~ill he handled toeether by <br />two organizations. They are Rocky <br />Mountain SER Jubs for Procress Inc.. <br />headed by area manacer Jertv Sanchez. <br />lrunlinm•d nn pq+'r• 'l <br /> <br />THREE BUILDINGS are under construction at the San Luis Project plant site <br />