Laserfiche WebLink
Richard D. Lamm <br />Governor <br />• iii iiiiiiiiniu iii <br />• <br />DEPARTMENT OF NATURAL RESOURCES _ <br />David H. Getches, Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C.SHELTON,Direetor <br />March 21, 1985 <br />Mr. Dean Erb <br />Assistant Manager <br />Home Office Bond Department <br />New Hampshire Insurance Company <br />Manchester, New Hampshire 03107 <br />RE: CBW Builders, Inc. et al (Una Pit), Permit No. 80-80 <br />Dear Mr. Erb: <br />Pursuant to your letter of March i5, 1985, we accept reinstatement of <br />Financial Warranty-Corporate Surety No. 40-23-66 for $188,168.00. By means of <br />this letter, we are advising the operator that this financial warranty is no <br />longer being cancelled and that a replacement warranty no longer has to be <br />posted by May 4, 1985. <br />In response to your last paragraph on Page 1, the Division does inspect <br />various sites on a periodic basis. Requests for financial warranty reduction <br />or release must be made by the operator. Once such a request is made, the <br />Division schedules an inspection of the site within 60 days of such a request <br />(pursuant to statutory requirements). The Division's findings are presented <br />to the Colorado Mined Land Reclamation Board (MLRB) at the next possible <br />monthly meeting. The MLRB may approve such a release or reduction request or <br />may increase the financial warranty if the MLRB believes the current financial <br />warranty is inadequate. <br />For your information, this site was last inspected on March 12, 1985. Please <br />contact the operator if a copy of the inspection report is needed for. your <br />file. <br />If you have any other questions, please contact the office. <br />Si~ely, <br />Peter V. O'Connor <br />Reclamation Specialist <br />PVOC/ljc <br />cc: Warren Gardner <br />8731E <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />~~~ <br />7 <br />