Laserfiche WebLink
<br />Stipulation No. 11 <br />THE DIVISION DIRECTS DORCHESTER COAL COMPANY TO SUBMIT A PROPOSED <br />REPORT FORMAT FOR THE REQUIRED SEMI-ANNUAL SUBSIDENCE MONITORING <br />REPORT, WITHIN 120 DAYS FOLLOWING PERMIT APPROVAL. THIS REPORT FORMAT <br />SHALL INCLUDE TABULATED SURVEY MONUMENT AND STRUCTURE LOCATION AND <br />ORIENTATION DATA. SURVEY DATA FOR THE TWO HIGH-RESOLUTION MONUMENT <br />GRIDS SHALL ALSO BE PRESENTED GRAPHICALLY, IN CROSS-SECTION FORM. 7HE <br />SUBSIDENCE MONITORING MAP SHALL BE AMENDED TO INCLUDE MONUMENT <br />IDENTIFICATION LABELING, IN ORDER TO FACILITATE DATA REPORTING AND <br />ANALYSIS. FINALLY, EACH SEMI-ANNUAL SUBSIDENCE MONITORING REPORT SHALL <br />INCLUDE A SUMMARY COMPARISON OF MONITORING RESULTS AND THE APPLICANT'S <br />PREDICTIONS FOR EACH INVENTORIED STRUCTURE AND THE STREAM CHANNEL OF <br />NEWLIN CREEK. <br />ACCEPTED AND AGREED: MINED LAND RECLAMATION DIVISION <br />COLORADO DEPARTMENT OF <br />NATURAL RESOURCES <br />By /..,... ~..cw C/',~c..c,c...,c~ <br />Operator Tit e <br />- .~ <br />Division Director I <br />AG Alpha No. NR LR TYB <br />AG File No. PNR/3928/JD <br />Doc. No. 6149 <br />