Laserfiche WebLink
<br />Ms. Paige Seville - 2 - September 24, 1985 <br />"The inclinometers will be installed in bedrock. During angering <br />activities to install the inclinometers, the cuttings will be Togged to <br />determine the depth of bedrock. The inclinometers shall be read <br />initially before the placement of any waste coal materials. During the <br />first year of waste pile operation, the inclinometers shall be read <br />monthly. After the first year of operation, the frequency of <br />inclinometer readings shall be amended. Beginning in the thirteenth <br />month after deposition of the first waste coal material in the <br />~c urt~t~e li' me er moni~ortma sc~da7e s a const~~readinas <br />wtii assure auarteriv monttortna wttn montniv monttortnq aurtna the <br />With the language modification your response would be acceptable. <br />If you have any questions, please feel free to call me or Jim Pendleton. <br />Sincerely, <br />~~ <br />Susan Mowry <br />Reclamation Specialist <br />SM/cj <br />Enclosure(s) <br />3593E <br />