Laserfiche WebLink
land. Rocks will not be windrowed on the pipeline trench with the other <br />material. Placement of the woody material and rocks will not interfere <br />with operation of water diversions. <br />• Rimrock: There is limited rimrock along the pipeline corridor route. The <br />rimrock area azound the upper eastern face of Davis F'oint may involve <br />additional cleanup, restoration, and rimrock repair using selective rock <br />placement and filling the slope close to its original contour. <br />• Slope Protection: Temporary riprap may be used to secure banks from <br />erosion. This may be material from the ROW constriction (lazge rock), <br />gabions, or sandbags. Slope protection will be designed for the particular <br />application required. <br />• Other. Upon completion of construction and reclamation, all fences and <br />other range improvement projects will be reestablished to as good or better <br />condition than the original. <br />During reclamation, all above-ground structures airrd above-ground <br />pipelines will be painted a color that blends ~Nith the natural <br />surroundings. <br />After complying with all restoration stipulations on public lands, <br />American Soda will submit a "proof of restoration" letter with the BL1v1. • <br /> <br />PjMIiN r7,n of [kvelopment 28 <br />Yankee Guld~ Sodimn Muzak fhojett <br />Amman Soda. LLP. <br />