Laserfiche WebLink
~. Ccr} <br />P a_body <br />PEABODY COAL COMPANY <br />Waatam ONlabe <br />_.~: - <br />_ ~~ = ~- <br />.,. <br />. .. ~_ _ i:.:J <br />April 22, 1988 <br />Mr. Peter O'Connor <br />Colorado Mined Land Reclamation Division <br />215 Centennial Building <br />1313 Sherman Street <br />III Ililllillllli III <br />999 <br />1300 South Vals <br />Ftagatafl. Amm~e 86007 <br />(502) 77d-5253 <br />Denver, CO 80203 <br />RE: Haul Road Certifications, Nucla Mine CC-~il'vO~~ <br />Dear Mr. O'Connor: <br />As a part of the permit renewal process, hauls for Mine <br />Areas 2 and 3 at Nucla Mine needed to be certified by March <br />15, 1988. On March 10, 1988 Peabody submitted as-built <br />certifications for these two roads as a part of Technical <br />Revision No. 2. In your letter of March 17, 1988, you <br />stated that the as-built certifications submitted did not <br />meet the requirements of the Professional Certification <br />Policy Memorandum dated July 13, 1984. <br />On April 25, 1988, Peabody submitted a permit revision to <br />Permit C-81-008. Tab 13, Attachment H (Volume 10) of this <br />permit revision contains the updated road as-built <br />construction summaries for these two haul roads. <br />Sincerely, <br />~ James Lunan <br />Manager - Permits <br />sk <br />