Laserfiche WebLink
FP.CiM <br />FqY N0. Oc•,. 11 3G99 01:17Pf1 P3 <br />- ~'~ TRAFFIC CONTROL <br />izeoCoumy qa i5a & BARRICADE <br />P.O Box 1034 Janice Girotlo <br />G,enwootl Sprincs, CO at502 Po99Y RiPGY <br />(303)945-5467 <br />Method of Handling TcaPCic <br />t3eaetal <br />The key eletnmts of Contracto~a method of handling traffic (MFfT1 are outlined in <br />subsection 630.08 of the Standard Specification for Road & Bridge Cotlalruction Book. <br />The Componectts of the TCP for this project are included in the following: <br />(1) Subaoction 10d.04 and suction 630 of the Specifications. <br />(2) Schedule of Construction Traffic Coidrol Devises. <br />(3) Standard Plan S-630-1, Traffic Controls for Highway construction <br />plan S•630-2. <br />Special Traffic Cautrol Plan requit+amenb for this project ate as follows: <br />C~.wi c~ Skr'ps 4~ar ~'-u c ks wf,o_.t her perm ~~ ~} ~ nc~ <br />acs. 18~' ~h.ro,,_3h o~.22'~, 1~1~1 <br />The Contcac:tnrY work shall be t~estricted to daylight hour's. <br />Pcutable Camsaucticxit Signs shall be removed or turned al the end of each day's work. <br />With the exception of Road block Ahead or Utility Wotic Ahead. Barricades such as Type <br />i or Type II shall delineate any hazard areas within the work aces. <br />Flagging: Section 630.12 <br />Traffic Control Supervisor: <br />Suction 630.09 <br />