Laserfiche WebLink
Reclamation work remaining to be done on site includes removal of the tipple <br />and coal loading facilities, and the sediment ponds. Exact timeframes for <br />removal of these facilities have not been set. <br />The reclamation plan being implemented is designed to establish a post-mining <br />land use of rangeland and wildlife habitat for the pit area and light <br />industrial for the haul road. Pursuant to 2.07.6(2)(1) the Division has <br />approved of this post-mining land use. <br />-5- <br />