Laserfiche WebLink
LIST OF EQUIPMENT OFFERED <br />The List of Equipment Offered form must be returned with each bid. All equipment to be used <br />on the project must be listed. The CONTRACTOR must own, have a current lease for the <br />equipment intended to be used to perform the work, or must furnish a statement of <br />arrangements to rent, or otherwise procure, adequate equipment to perform the work. <br />Inclusion of a piece of equipment on the List of Equipment Offered represents a commitment <br />to devote that piece of equipment to the project work for the entire duration of the project.lf <br />several contractors propose to join together to perform the work under this purchase order <br />contract, equipment owned or controlled by each should be listed and the owner identified. <br />A purchase order contract will not be awarded to a bidder who in the opinion of the OWNER <br />(aI does not have adequate equipment, or (bl does not have firm and satisfactory <br />arrangements to obtain adequate equipment to perform the work described in the Invitation <br />and Bid. <br />SIGNATURES <br />If the Bidder is a corporation: The bid must be signed by an officer (President or Vice <br />President), and the title indicated. The signature of the officer shall be attested to by the <br />Secretary and properly sealed. Include the corporations Federal Employer ID Number in the <br />"Tax ID" blank. <br />If the Bidder is a proprietorship: The Owner must sign the bid and print or type his name, the <br />business name and social security number. <br />If the Bidder is a partnership: The majority or general partner must sign the bid. The same <br />person must sign the contract, if awarded. Also include the company name and tax ID <br />Number. <br />BID AWARD <br />Award will be made with reasonable promptness, by written notice to the low responsive and <br />responsible bidder whose bid meets the requirements and criteria set forth in the Invitation for <br />bid. These criteria will include, but not be limited to the lowest GRAND TOTAL PRICE, <br />corrected if necessary for errors in price extension and/or addition, on the Bidder's equipment <br />if a List of Equipment Offered is required with the bid, and capability to meet the performance <br />time requirements. The GRAND TOTAL PRICE will be used for comparing bids only. <br />PROJECT DATES <br />The project is scheduled for construction between May 1 , 1995 and May 30, 1995. This <br />includes ten (10- days mobilization time. <br />TIME OF COMPLETION <br />The time of completion allowed for the project is 30 calendar days after receipt of the Notice <br />to Proceed. This includes ten (10) days mobilization time. <br />LIQUIDATED DAMAGES <br />The liquidated damages for this project will be 5300.00 per day. Please see Genera/ <br />Conditions, Articles 34, 35 and 40. <br />