Laserfiche WebLink
<br /> <br />-4- <br />Foidel Creek Mine <br />Complete inspections - 03/08/90 <br />04/25/90 <br />07/ 10/90 <br />10/17/90 <br />Partial inspections - 01/22/90 <br />02/05/90 <br />05/10/90 <br />06/ 20/ 90 <br />07/25/90 <br />08/20/90 <br />09/27/90 <br />11/08/90 <br />FREQUENCY WAS MET AT THIS SITE. <br />Inspection focus on underground waste disposal, and drainage control. The <br />facilities area should be checked for unapproved structure development, and <br />non-coal waste/fluid storage. The site is generally well maintained. <br />Possible Schedule for 1991 <br />Jan Feb March April May June July Aug Sept Oct Nov Dec <br />Apex CC CC CC CC <br />Elam CP CP CC CC CP CP CC CP CP CC CP CP <br />Trapper CC* CP CP CC CP CP CC CP CP CC CP CP <br />Mine No. 3 CC CC CC CC <br />Eckman Park CC* CP CP CC CP CP CC CP CP CC CP CP <br />Foidel Creek CC* CP CP CC CP CP CC CP CP CC CP CP <br />* The first quarter complete inspections are normally conducted in March at <br />these mines. Since snow will preclude detailed inspections during January, <br />very detailed partials are recommended for these sites during March. <br />/ern <br />2648E <br />