Laserfiche WebLink
information will be submitted within sixty (60) days of the 1993 <br />proposed permit renewal decision. <br />This stipulation was complied with through the approval of minor <br />revision no. 93 on June 20, 1994. <br />Stipulation No. 43 <br />The operator will, pursuant to Rule 4.27, submit to the Division <br />within sixty (60) days of the 1993 proposed permit renewal <br />decision, a technical revision to permit C-81-038 to address <br />compliance of the Orchard Valley Mine with requirements of steep <br />slope mining. <br />This stipulation was complied with through the approval of minor <br />revision no. 86 on October 6, 1993. <br />Stipulation No. 44 <br />The operator will submit two (2) sets of maps (final version) that <br />were revised by approval of PR-03. The maps will be certified by <br />a registered professional engineer and will be submitted to the <br />Division by August 27, 1993. <br />This stipulation was complied with by submitting the requested maps <br />which have been incorporated into the permit application document. <br />Stipulation No. 45 <br />The operator will, by September 17, 1993, submit an executed right <br />of entry document to the Division giving COVCC access to the <br />Robbins property (No. 77 on Map 9-2) to conduct subsidence surveys, <br />monitoring, and repairs to structures and renewable resources <br />located thereon. In no case will COVCC undermine these structures <br />and resources before the subsidence surveys have been conducted. <br />This stipulation was a duplication of stipulation no. 27 with the <br />added specificity to a particular property. It was therefore <br />terminated on March 2, 1994 by letter from Steve Shuey to Karl <br />Koehler. This letter is in the stipulation file. <br />Stipulation No. 46 <br />COVCC will, by September 17, 1993, revise the appropriate text, <br />tables and maps within Permit C-81-038 to include and initiate <br />monitoring of pond 3-6 according to the procedures outlined for <br />pond monitoring currently approved in Section 2.05.6 of the above <br />permit. The first data recorded for pond 3-6 should reflect <br />monitoring beginning September, 1993. <br />This stipulation has been complied through the approval of minor <br />revision no. 89 on december 9, 1993. <br />8 <br />