My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL54164
DRMS
>
Back File Migration
>
General Documents
>
GENERAL54164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:29 PM
Creation date
11/23/2007 9:15:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
11/1/1994
Doc Name
RECOMMENDATION OF RECISION OF APPROVAL FOR DRAIN COVER MATERIAL SIZE GRADATION CHANGE CRESSON HEAP L
From
DMG
To
BRUCE HUMPHRIES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Memo to Bruce Humphries <br />Recision of Cresson Drain Cover Spec. Change <br />page 2 <br />The purpose of the visual monitoring and select recovery of <br />oversize material is to improve the odds of success. For that <br />reason, in our meeting with CC&VG and Golder personnel on October <br />13th, I repeatedly emphasized the importance I placed upon <br />compliance with the visual monitoring. You, Carl Mount and Mike <br />Long were in attendance at that meeting and should recall my <br />specifically cautioning CC&VG and Golder as to the reliance I <br />placed on their compliance with this condition in completing my <br />opinion to recommend approval. <br />Having now been informed that CC&VG's Contractor and CQA agent both <br />decided to ignore this condition, which is simple to implement by <br />merely instructing the dozer operators never to proceed without the <br />appropriate personnel in attendance, I face an untenable situation. <br />Because I now have no ability with which to confidently conclude <br />that the drain cover material is being properly installed at.the <br />Cresson Mine, I conclude that I am left with no alternative but to <br />recommend to you that the Division immediately rescind our approval <br />of the size gradation change granted for the areas outside the <br />"Pregnant Solution Storage Area" of the Cresson Phase One Heap <br />Leach Pad. <br />Further, I recommend that we direct CC&VG to remove and replace the <br />drain cover material placed on the entire panel in question under <br />appropriate monitoring and control procedures. In addition, I <br />recommend that the Division inform Golder Associates Inc. that we <br />are unable to understand how they will be able to certify the drain <br />cover material placed on the panel in question. Further, in the <br />interest of resolving this problem before access to the material is <br />further occluded, I recommend that we request that Golder <br />Associates Inc. provide us with an explanation of their intention <br />in this regard. <br />cc: Mike Long <br />Carl Mount <br />Gary Curtiss <br />Berhan Keffelew <br />Doc: M:\MIN\JAP\CRESSON\RESCIND.WP5 <br />JP/JP <br />
The URL can be used to link to this page
Your browser does not support the video tag.