Laserfiche WebLink
separately. <br />In reference to the lay down area, a temporary road will be <br />constructed down to the area. The road and area are shown on Map IV-9. <br />The temporary road and lay down area would be used only during this <br />project and reclaimed upon completion of same. It is anticipated the <br />construction would be completed by January 1, 1985, although this period <br />could be extended if delays are encountered. The reclamation work would <br />either occur this fall, if the project is completed in time, or the <br />spring or Sumner of 1985. If the reclamation work is done during the <br />Sumner the area will be seeded and mulched during the fall. <br />The temporary road and part of the lay down <br />highway right-of-way. Therefore, in addition to <br />received from the Department of Highways, which is <br />permit, Empire will obtain a Utility Permit <br />construction activities. Once this permit is obtai <br />be forwarded a copy of same. <br />area will be in the <br />the approval letter <br />part of the existing <br />from them for the <br />ned the Division will <br />The temporary road will be constructed in an area previously <br />disturbed by construction of the highway; therefore, no virgin topsoil <br />exists. It will be approximately 30 feet in width and 80 feet in <br />length. However, during road construction the top 3-6 inches of material <br />will be bladed aside and saved for final reclamation. The road will be <br />constructed down to the lay down area. In reference to the lay down <br />area, which is approximately 80 x 200 feet, 6-12 inches of available <br />topsoil will be salvaged and stockpiled adjacent to 'the site for final <br />(REV. 9/24/84) <br />IV-44k <br />