My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL54047
DRMS
>
Back File Migration
>
General Documents
>
GENERAL54047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:24 PM
Creation date
11/23/2007 9:10:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
General Documents
Doc Date
4/11/2006
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Midterm Review -Sanborn Creek and Elk Creek Mine <br />This document presents the results of the Midterm Review of Oxbow Mining LLC's <br />(OMLLC) Sanborn Creek and Elk Creek Mines, conducted by the Colorado Division of <br />Minerals and Geology (the Division). This Midterm Review was conducted to fulfill the <br />requirements of the Colorado Surface Coal Mining Reclamation Act, and Rules 2.08.3, <br />2.06.2(9), 2.06.3(4), 2.06.5(3), 2.06.7(5) and 3.02.2(4) of the Rules and Regulations of <br />the Colorado Mined Land Reclamation Board for Coal Mining. <br />Rule 2.08.3 requires the Division to conduct a review of each permit issued, prior to its <br />midterm (2 %z years). Based on this review, for good cause shown, the Division may <br />require reasonable revisions to, or modifications of, the permits provisions to ensure <br />compliance with the Act and Regulations. <br />Rules 2.06.2, 2.06.3, 2.06.5 and 2.06.7 require that during the midterm review, where <br />applicable, experimental practices, mountaintop removal variances, variances from <br />approximate original contour (AOC), and variances from contemporaneous reclamation, <br />respectively, be reviewed by the Division. The Sanborn Creek and Elk Creek Mine do <br />not conduct experimental practices, nor have variances been granted for mountain top <br />removal, approximate original contour or contemporaneous reclamation. <br />Rule 3.02.2(4) requires the Division to review the amount of performance bond liability <br />and the terms of acceptance of the bond every 2 %z years. <br />The proposed decision date for Permit Renewal No. 4 was 10 October 2003. The permit <br />was issued on 3 December 2003. The Proposed Decision and Findings of Compliance <br />were updated at the time of the proposed decision. <br />Section I -History of Site <br />The Sanborn Creek and Elk Creek Mines, operated by Oxbow Mining, LLC., are located <br />in Delta and Gunnison Counties, and are adjacent to the town of Somerset on Colorado <br />State Highway 133. <br />The original permit under the Colorado Permanent Regulatory Program was issued to <br />U.S. Steel Mining Company, Inc. on 1 I October 1983. Kaiser Coal Corporation acted as <br />operator on the property from 1986 to 1990. In 1990, their permit was transferred to <br />Somerset Mining Company and Somerset completed the permit renewal for another <br />five-year permit term. That permit period initiated 11 October 1988 and expired 11 <br />October 1993. <br />Upon finalization of the purchase of the mine and transfer and renewal of the permit, <br />Somerset Mining Company proposed opening a new set of mine portals, named the <br />Sanborn Creek Mine, to access, first, the C seam and, then, ramp down to the B seam. <br />Most of the production would come from the B seam. This proposal was presented in <br />Sanborn Creek and Elk Creek Mine <br />Permit No. C-1981-022 <br />2006 Midterm Review <br />11 Apri12006 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.