Laserfiche WebLink
<br />O2iO3i94 16 52 S 303 790 4050 <br />MINERS INC P.12 <br />OETA1l OF ESTIMATE RC ! _~__ <br />Estimated by ___~_ RlO_~_____ Date 1(25(9! Pege 1 of 1 Shee: <br />Location: Hotchkiss, Colorado SNnrth Fork Branch-MP A1T r 1165' Route: NAC <br />Descrlptlon: In connection rlth the demo11i1on o! cro coal s11os at the old Nark's Nest ludtn~ <br />fscility (by outside eontractar Miner's, Int.) remove and relnstell eoorozimately <br />300 i.F. of [rack. 1001 RFCOLLECTIBLE <br />Temper (2 Days) S 950 <br />Burro Crane (2 Days) ; 500 <br />Material: <br />EIN DESCR1PT1OH <br />622 Grosc Ttee 9' <br />63a Track Spikes 5/B'x 6' (10/Tic) <br />633 Ballast (Road Base-2 Truckloads) <br />Contingency <br />Labor: <br />E!N <br />626 Section Laborers (9 Men/2 Oeys) <br />626 Conductor (1 Men/19 Oays) <br />626 Fleeman (1 Man/15 Deys) <br />62fi Burro Crane Operator (1 Men/2 Days) <br />626 Tapper Operator (1 Men/2 Oays) <br />Contingency <br />Overheads on labor <br />COND OTY UNITS <br />Ner 30 Ee 0 f 25.50 ; tT0 <br />Ner 300 EA 0 0.21 60 <br />Lot 1,000 <br />• 101 1B0 4 <br />2,010 <br />Lot ; 1,790 <br />Lot 7,500 <br />Lot T,5DD <br />Lot 390 <br />lot 3B6 <br />0 tot 1,150 ; 19,260 <br />122.611 of ; 19,260 ; 23,610 <br />TOTAL NET COST 3 A6,33D <br />Note: Billing rill be on an actual cost basis rhether more or less than the estimated anount. <br /> <br />