Laserfiche WebLink
Introduction <br />This document is the proposed decision of the Colorado Divisionof Iviinerals and Geology (Division) <br />in response to a request by the Coors Energy Company (CEC) for Partial Phase I and Partial Phase II <br />bond release (Application, requesting a release of $3,301,516) at the Keenesburg Strip Mine, Division <br />permit number C-81-028. The package contains five parts. These include: 1) procedures and summary <br />of the bond release process; 2) criteria and schedule for bond release; 3) observations and findings of <br />the Division regarding compliance with the bond release requirements of the Colorado Surface Coal <br />Mining Reclamation Act and revelations promulgated thereunder; 4) the Division's conclusions; and <br />5) the Division's proposed decision on the request for bond release. <br />Detailed information about the review process can be found in the Act and the Regulations of the <br />Colorado Mined Land Reclamation Board for Coal Minirtg (Board). All Rules referenced within this <br />document are contained within the Regulations. Detailed information about the miningand reclamation <br />operations can be found in the permit application on file at the Division offices, located at 1313 <br />Sherman Street, Room 215, in Denver, Colorado. <br />The Keenesburg Strip Mine is a surface coal mine which is permitted and operated by CEC. The latri <br />for which bond release has been requested is CEC-owned and coal which was mined from the area wa; <br />CEC-owned. Mining started in 1980. Reclamation for which Phase I bond release has been requested <br />was conducted up through 1995. Reclamation for which Phase II bond release (including associated <br />portions of the Phase I work) has been requested was conducted up through 1987. <br />Acronyms and abbreviations used in this document are: <br />Act Title 34, Article 33 of the Colorado Revised Statutes of 1973 <br />Application December 16, 1996, Application for Phase I and II Bond Release at the <br />Keenesburg Mine (CDMG permit C-81-028 with enclosures) <br />AUM animal unit month <br />Board Colorado Mined Land Reclamation Board <br />CEC Coors Energy Company <br />Division Division of Minerals and Geology <br />NRCS Natural Resources ConservationService(formerly the SoilConservationService) <br />Permit A series of three volumes consisting of a Permit Application Form and <br />supporting documentation, a permit document that permits the mining and <br />reclamation activity, text, drawings, maps, studies, reports, etc. <br />11 August 98 <br />