My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53951
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53951
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:20 PM
Creation date
11/23/2007 9:05:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
General Documents
Doc Date
6/16/1993
Doc Name
COMPLAINT LETTER BASIN RESOURCES INC THE NEW ELK MINE PN C-81-012 THE GOLDEN EAGLE MINE PN C-81-013
From
DMG
To
BASIN RESOURCES INC
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIiIII III <br />999 <br />C <br />o-~ ~ <br />'~ c`C ~.ti <br />•.. <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources ~; OF ~40q <br /> 4 <br />~~ b <br />I J 1 3 Sherman 51., Room 215 ~ <br />Denver, CO 80203 <br />Phone: (3071866-1567 rats ~ <br />FAX:(J0318J2-8106 <br /> Roy Romer <br /> Governor <br />June 16, 1993 Michael8 Long <br /> Division Director <br />Mr. Ron Thompson <br />Basin Resources, Inc. <br />14300 Highway 12 <br />Weston, CO 81091 <br />RE: Complaint Letter, Basin Resources, Inc., The New Elk Mine, Permit No. <br />C-81-o12, The Golden Eagle Mine, Permit No. C-81-013 <br />Dear Mr. Thompson: <br />On May 12, 1993, the Division received a letter from Mr. Michael A. Ossola <br />with the Las Animas County Planning and Land Use Office. Mr. Ossola has <br />raised concerns with fugitive coal dust from stockpiles at the Golden Eagle <br />and New Elk Mines, with dust from haul trucks being deposited on areas near <br />State Highway 12 between the two mines, and with the possibility of <br />spontaneous combustion within the stockpiled coal. <br />The Division will be conducting an inspection of the Golden Eagle and <br />New Elk Mines later this month to address these issues. We hope to resolve <br />any potential problems by the end of this month. Please look into these <br />concerns as soon as you can, and we will discuss them with you during the <br />inspection. Should you have any questions, please call me or Joe Dudash. <br />Sincerely, <br />Daniel I. Hernandez <br />Senior Reclamation Specialist <br />DIH/amm <br />Enclosure(s) <br />cc: Joseph J. Dudash, OMG <br />Steven G. Renner, OMG <br />Michael A. Ossola <br />7808E <br />
The URL can be used to link to this page
Your browser does not support the video tag.