My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53927
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53927
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:19 PM
Creation date
11/23/2007 9:04:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
General Documents
Doc Name
HAZARDOUS CHEMICAL INVENTORY REPORT FIELD SAMPLING AND TESTING DURING JUNE 28-30 1991
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMO <br />DATE: June 27,1991 <br />TO: Bob Nondorf, Division of Purchasing r_ <br />FROM: Tom Gillis, Mined Land Reclamation Division ~~ <br />RE: Hazardous Materials Sampling Project P.O. 1 <br />Enclosed are the certificates of insurance from the low-bid vendor <br />for the above referenced project. Also enclosed is an invoice from <br />the vendor for the required insurance coverage. None of the vendors <br />who bid on the job were informed prior to bid submittal that insurance <br />would be required as part of the job. The low-bid vendor is a one-man <br />consulting firm and does not regulary carry general public liability <br />insurance or workmen's comp. in the amounts which are required by the <br />State. As such, it would appear reasonable and prudent to add the <br />cost of the required insurance coverage to the original bid amount of <br />$2,795.00. The increase of $500.00 to the original bid amount will <br />still result in a savings to the State of $1,332.90 when compared to <br />the second lowest bid amount of $4,627.90. <br />For these reasons, I request that the purchase order amount for the <br />sampling project be increased to $3,295.00 in order to cover the <br />additional cost for insuring the vendor while performing the project <br />work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.