My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53896
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53896
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:18 PM
Creation date
11/23/2007 9:02:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
General Documents
Doc Date
1/21/2000
Doc Name
FAX COVER COPIES OF COST ESTIMATING SOFTWARE OUTPUT SAN LUIS PROJECT M-88-112
From
DMG
To
EPA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />~ Agency or organization name : DMG <br />Task k. 003 State :Colorado PermNjob»:M$8-172 <br />Date: 12/OBr99 County:Costil/a Abbreviation :none <br />i User: JO7 Sne:San Luis Project Flename :M112~003 <br />Permit or other job action : reclamallon <br />Task description :waste rock contouring <br />HOURLY EQUIPMENT COST Basic machine:Cal O6N (1996) Horsepower: 2B5 <br />Blade type :Universal <br />Attachment no. t : ROPS Cab Shia basis : 1 oer day <br />Atachmenl no. 2 : NA <br /> Utilization % Cost data source: tCRG) <br />Cost Breakdown : Ownership cost/hour : $35.37 NA <br />Operating cosUhour: $55.90 100 <br />Ripper op. cosVhour: $0.00 NA <br />Operetor cost/hour: 323.12 NA <br />Total unit cosUhour: $114.39 Total sleet cosVhour: $"14.39 <br />MATERIAL QUANTITIES <br />Inilial Swell <br />volume: 24,200 LCY lactor <br />Source of quantity take-off :calculation <br />Source of est. swell factor : NA <br />Average push distance: 100 feet <br />Unadjusted hourly production : 964 LCY/hr <br />Material consistency descnption <br />Loose srockpde <br />Average push gradient : 20.00 °~o (negJ <br />Average site altitutle : 8,600 leet <br />Matedal weight : 2.900 Ibs/LCY <br />Material weight description <br />Decomposed rock - 50°6 Rock. SOY Earth <br />JOB TIME AND COST <br />Fleet size: / Dozers) <br />Unit cost: $0.130 /LCY <br />Lo05e <br />NA volume : 24,200 LC <br /> S ~urce <br />Operator skits: 0.75 (;vg.) <br />Material consistency: 1.20 (C;t HBJ <br />Dozing method : 7.20 tslot) <br />Visibility: L00 (rvg) <br />Job efficrency: 0.83 (lslvlNday) <br />Spoil pile : 0.90 (s;d-/c) <br />Push gradient: 7.43 (C yr HBJ <br />Altitude: 1.(b (Cr1 HB) <br />Material weight : 0.79 (C.tl HB) <br />Blade type : 1.00 /S or U) <br /> <br />Net correction: 091 <br />Atljusletl unit pmducuon : 879.22 LCY, hr <br />Adjustetl Ileet pmduction : 879.22 LCY~hr <br />Total job time : 27.52 Hour; <br />Total (ob cost : $3, 749 <br />
The URL can be used to link to this page
Your browser does not support the video tag.