My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53880
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53880
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:17 PM
Creation date
11/23/2007 9:02:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981015
IBM Index Class Name
General Documents
Doc Name
BID FRUITA MINE AMERICAN SHIELD BOND FORFEITURE
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR shall be reflected in each Bid Item or shall be paid at the CONTRACTOR's <br />expense. <br />ADDITIVE ALTERNATE ITEM 3 - REVEGETATION <br />All other areas disturbed and/or compacted during channel construction work will be revegetated <br />according to the Revegetation Specifications (20.0) in the General Bid Specifications. Commercial <br />fertilizer OR manure may be used for this project. Seed will be supplied by the OWNER. <br />Revegetation work will be initiated immediately upon completion of all excavation and regrading <br />work. Revegetation may be completed concurrent to completed AND APPROVED channel <br />construction or regrading activities. The OWNER will supply all the seed for the reseeding and <br />mulch for mulching. The CONTRACTOR will supply the fertilizer, fertilizer application, seed <br />application, mulching, and mulch crimping. Earthmoving activities related to channel construction <br />and regrading activities are estimated to disturb approximately 2 acres that will require <br />revegetation. <br />Measurement and Payment <br />Payment for this item will be reflected in a lump sum bid under Additive Alternate Item 3. This lump <br />sum bid will cover payment of all costs for fertilizing (including supplying fertilizer), seeding, <br />mulching, and mulch crimping. These revegetation procedures will be performed on alt regraded, <br />backfilled and other areas requiring revegetation due to channel construction or regrading <br />procedures. There will be no measurement for payment. Payment shall be as this item is <br />completed and approved by the PROJECT MANAGER. Payment for this item will be made only <br />for that amount shown under Additive Alternate Item 3 of the Bid Schedule. Any or all incidental <br />costs incurred by the CONTRACTOR shall be reflected in each Bid Item or shall be paid at the <br />CONTRACTOR's expense. <br />PROJECT OBSERVATION <br />The PROJECT MANAGER will be at the project site periodically to monitor construction activities <br />and ensure that each work item is completed and constructed to design specifications. The <br />PROJECT MANAGER will be available during regular business hours (8:00 A.M. to 5:00 P.M.) on <br />weekdays. Inspections will not be scheduled on weekend days or holidays without prior approval <br />of the PROJECT MANAGER. It is the Contractors responsibility to schedule inspections with the <br />Project Manager so as not to delay the work. The following items must be observed and approved <br />by the PROJECT MANAGER before proceeding with additional work: <br />All Equipment Rental hours <br />2. All revegetation procedures. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.