My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53880
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53880
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:17 PM
Creation date
11/23/2007 9:02:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981015
IBM Index Class Name
General Documents
Doc Name
BID FRUITA MINE AMERICAN SHIELD BOND FORFEITURE
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT WORK DESCRIPTION <br />The following tables contain basic information and work descriptions for each of the hazardous <br />mine openings to be safeguarded in this project and other project work as described. When <br />reference is given, please refer to the Colorado Inactive Mine Reclamation Program General Bid <br />Specifications 1996 for details of the Standard Work Specifications (SWS) and Standard Drawing <br />Descriptions necessary to complete this project. <br />ITEM 1- MOBILI2ATIONIDEMOBILI2'ATION <br />Mobilization <br />This task includes moving equipment and supplies to the project area. If desired, the <br />CONTRACTOR may establish a staging area for the storage of all equipment and supplies. The <br />area shall be of adequate size to accommodate all of the CONTRACTOR'S vehicles, equipment, <br />and supplies and shall be approved by the PROJECT MANAGER. The CONTRACTOR shall <br />minimize impact on the staging area with regard to noise, dust, and fumes. The CONTRACTOR <br />shall be responsible for maintaining security of the staging area. <br />This task also includes all labor and costs associated with locating and protecting utilities, both <br />above ground and underground, at the work site. <br />The CONTRACTOR shall exercise caution during mobilization, performance of all work tasks, and <br />demobilization in order to avoid damage to public and private property including, but not limited to, <br />pavements, soils, vegetation, water supplies, fences, walls, structures, existing sediment ponds, <br />landscaping etc. The CONTRACTOR shall repair and restore public or private property damaged <br />during the work at his expense. See also Section 1.0 of the "Standard Work Specifications" <br />included in CDMG General Bid Specifications, 1996. <br />Demobilization <br />This item shall include all labor, equipment, and costs associated with demobilization and clean-up <br />of the work site to its original or better condition. All equipment and supplies, materials, and debris <br />related to this project will be removed from the site upon completion. The CONTRACTOR shall also <br />reclaim any staging area or other ground disturbed during the course of the project located outside <br />of the project area as defined by this Bid Document. Areas of disturbance will include those areas <br />compacted as a result from equipment or vehicle traffic. All compacted areas will be ripped to a <br />minimum depth of 8" on 24" centers. All haul roads will be fully regraded and reclaimed upon <br />completion of the project. Additional final grading shall be accomplished to reduce any cuts left from <br />machinery or oversleep slopes within impacted areas, if needed. <br />The CONTRACTOR shall be fully responsible for any and all damage to property caused by his <br />equipment or personnel. The CONTRACTOR shall ensure that the job site is restored to original <br />or better condition and that the PROJECT MANAGER accept that the work is complete. See also <br />Section 1.0 of the "Standard Work Specifications" included in CDMG General Bid Specifications, <br />1996. <br />
The URL can be used to link to this page
Your browser does not support the video tag.