Laserfiche WebLink
12u1e 4.15.111 requires that file areas developed lift industrial or cununerci:d use the ground erect <br />of tiring plants shall not he Iess than rcyuircd to control erosion. I final bond release shall nut <br />occur prior to satislacu,ry cover establishment. <br />Itl.t'I. \\t:\ I It )T\ fi<)\D I IIS ft 4t 1' <br />his scrtion outlines the hisron of the previous hand release :+pplie:Uions pruecsaed and <br />appnwed by the Uivisiun. The li,llawing color-highlighted test was taken Irum the appropriate <br />rrrittcn lindings published by the Division :LS part of the :+ppmval process for each prcviuus hand <br />release. <br />S[S[=t) II Phase I tile majority of disturbed area) <br />1t the cessation of mining activities in Docenttxr of 1995, the pertbmtance bond required to he <br />held by the Division for reclamation was S I ,490,5 I' 00. 'I"ethnical Revision b47 (Ill-al l <br />modified the required hand amount to lx: held M' the Division, :+s shown htlow in Table A. First. <br />hvo structures, the ricer intake ponds and the associated pumphouse were approved to rctnain to <br />allow dccelupment of the aajudieated water right held by the landowner. titcund. fK-47 reduced <br />the rcyuircd hood to fw held by $179,971L0U for dcvclupmrntul drilling sites that were approved <br />but octet cunstnuted. I in;+lly. fR-47 transferred the bond li~+hilin ufSl55.ttR~.UO li,r <br />esploratiun site,. originally penniUcd as revision. to the permit. w,ut e~iaint V+~ticr ~~t Intent <br />lf~OI1. <br />Table :\ <br />aotion Change in liability' Itoyuired Liubilih <br />~9iueClosurc $I.-(90.51'_.0(1 51.1+>p.>1_(10 <br />11'R-471 <br />ponds?pnmpnldg 1$ I ,501.1101 51,x89,011.00 <br />1'I R-471 silos not <br />drilled ($179,970.00) $1,3(19,041.00 <br />(I~R-47) uansli•r <br />to \'t71 ($155.08'.Utl) 41.15±')>9.On <br />tiubtotal $1,153.9>9.0(1 <br />1381 did nut request hand release lilt the Thins Vurth ventilation shall and the 1~1b'-1 bleeder fan <br />in this }xmd release application. the lxmd amount associated kith each of these li+tilities is <br />included in the subtotal :unuunt of 51.153,959.011. Thercti,rc, as shown in I;thle [3 lxauw. to <br />determine a hand amount for which this Phase 1 bond release lSl.-(11 I request is applicable. these <br />costs need to he rcmuved In?m the current reclamation liability. <br />