My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53825
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:15 PM
Creation date
11/23/2007 8:57:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981015
IBM Index Class Name
General Documents
Doc Date
2/17/2000
Doc Name
Thank You Letter
From
Paul Krabacher
To
All Contractors Bidding on Fruita Mine
Permit Index Doc Type
Reclamation Project
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />°'; <br />DATE: February 17, 2000 <br />TO: ALL CONTRACTORS BIDDING ON THE FRUITA MINE/AMERICAN SHIELD BOND <br />FORFEITURE <br />FROM: PAUL KRABACHER, PROJECT MANAGER <br />PHONE 970-248-7253 <br />RE: AMENDMENT No. I TO PKA-0-455 <br />I would like to thank-you all for attending the pre-bid meeting held today for the Ftuita Mine bond forfeiture site. <br />Below are the changes or additions to the bid. <br />The Bid Document should be FRUITA MINE/AMERICAN SHIELD BOND FORFEITURE/C-81-015 <br />not M-81-015 <br />DIVISION O F <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Executive Director <br />Michael B. Long <br />Division Director <br />1. Enclosed is a site map of the proposed work for bid. Also enclosed is a post reclamation map showing existing <br />contours WITHOUT the developed gultey and associated deposition resulting from the 1999 flood. <br />e <br />2. The project Time of Completion has been extended to 35 calendar days after the receipt of the Notice to Proceed <br />with project work scheduled to commence April 3, 2000. <br />3. All terms and conditions of the Invitation and Bid other than as changed by Amendment No. 1 and this <br />amendment remain the same. <br />4. Receipt and acceptance of this amendment wil] be acknowledged by returning the Receipt and acceptance of <br />Amendment 1 to PICA-0-455 sheet attached. <br />M: \impUCRH\AM ENDME.NTS\FRUITA. PK. dot <br />
The URL can be used to link to this page
Your browser does not support the video tag.