My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53805
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53805
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:14 PM
Creation date
11/23/2007 8:57:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
General Documents
Doc Date
11/21/2003
Doc Name
Request for Additional Time to Develop Closure Plan
From
Peak Project Management LLC
To
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM : FRX N0. 17199464975 Nov. 21 2093 11:11RM P1 <br />Peak Project Management, LLC <br />34115 County Road 20.8 <br />Trinidad, CO 81082 <br />Phone/Fax: (719) 848-4975 <br />Cell: (719) 859.0111 <br />email: ronthompsengrsensonics.org <br />November 21, 2003 <br />Mr. David Beny <br />Division of Mincnls and Geology <br />215 Centennial Building <br />I3 i 3 Sherman St. <br />Denver, CO 80203 <br />Re: Golden Eagle Mine, Fcrmit No. G81-D 13 <br />-: Northwest Airshaft Closure Plan <br />•~ <br />. ` <br />Dear Mr. Berry: <br />Basin Resources is working with Halliburton Energy Services to develop s Closure Flan fur abandoninv <br />the Northwest Airshaft that complies with Rule 4.07 of the Regulations of [hc C:olondo Mined Land <br />I Reclamation Board for Coal Mining. 6pecifically, Halliburton ltas been directed to develop a grouting <br />~~ technique to ensure that each of the water bearing zones are adequately sealed. <br />Halliburtou has indicated shat they n;quire additional time to plan the methodology and materials to be <br />used in successfully abandoning the air shaft For this reason, Basin is requesting an extension to <br />Dceearrber 12, 2003 to submit a technical revision to the Golden Eagle mining permit for the permanent <br />closure plan ofthe North West #1 Bleeder Fan Shaft.'I'his technical revision will also address temporary <br />access requiremenu, site preparation, and bonding requiremenu. The submittal will include ai! available <br />construction records for the air shaft and site reclamation following completion of abandonment. <br />Rasur intends to implement the closure plan as soon as possible following Division approval of the <br />technical revision, subject to availability of Hailiburton equipment. Project compaction is currently <br />projected to require 5.7 working days. <br />Plans were discussed with Kcnt Ciorham during his monthly inspection of the Golden Eagle Mine this <br />week. This included art on- site inspection and review of the requirements for adequate access and <br />equipment placement during the closure operation. <br />Please contact me if there are any additional questions. <br />Srly, <br />Ronald G. Thompson <br />for Basin Resources, loc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.