My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53745
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53745
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:11 PM
Creation date
11/23/2007 8:53:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
General Documents
Doc Date
12/6/1994
Doc Name
AFO REQUEST MEMO
From
DMG
To
COAL STAFF
Permit Index Doc Type
INSURANCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c~ <br /> <br />Mine Plan Revisions Needed <br />Mine Name Approval Date Material Needed Revision Description <br />West Elk Mine Unknown Need revised Sec. 2.05 Disposal of Gob from <br /> the Bear Mine in the <br /> Mountain Coal Company <br /> refuse pile field decision. <br />West Elk Mine 07/22/93 Need Exh. 53 Reclaim Raven Mesa <br /> exploration road. <br />West Elk Mine 08/27/93 Need p. 53 8 54 Construct concrete <br /> gravel bunker. <br />West Elk Mine 04/28/93 Need p. 53 Repair of conveyor <br /> bents. <br />West Elk Mine 10/28/93 Need Exh. 66 Pave bathhouse parking <br /> lots and ditches. <br />West Elk Mine 10/28/93 Need Map 54 Install French drains. <br />West Elk Mine 12/21/93 Need Map 54, Figure Refuse pile minor <br /> 2.OA reconfiguration. <br /> <br />APEX #2 10/13/93 Need pp. 16.2-10 Modify reclaimed <br /> channel. <br />APEX #2 01/28/94 Need p. 181A Highwall Reclamation <br /> plan. <br /> <br />King Coal Mine 07/21/93 Need App. P.I. Size change for waste <br /> pile drain. <br /> <br />New Elk Mine 02/16/94 Need Map 11 Installation of acid <br /> storage tank at <br /> processing plant. <br /> <br />Golden Eagle 09/13/93 Need p. 2.05-8, Map 10 Two fan installations. <br />Mine <br />Golden Eagle 03/19/93 Need pp. 2.05-1., 2, 8, One pump methane <br />Mine Exh. 19, Map 18 venting test. <br />Golden Eagle 11/05/93 Need p. 2.05-25(B) Revise seeding rate. <br />Mine <br />
The URL can be used to link to this page
Your browser does not support the video tag.