My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53744
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:11 PM
Creation date
11/23/2007 8:53:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
General Documents
Doc Date
8/10/1981
Doc Name
SATISFACTION OF STIPULATIONS TO THE DESERADO MINE PERMIT
From
MLR
To
WESTERN FUELS ASSOCIATION INC
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! ~ <br />S TATF OF COI OI+A I)O un n.vn NM 4~•v,~„.„~ 'll ,l"I"It„",f <br />DEPARTMENT OF NATURAL RESOURCES 999 <br />D. Monte Pascoe, Executive Duector <br /> <br />423 Ceniennlal Bulltling. 1313 Sherman Street <br />Denver, Colo ratlo 80203 Tel (303) 839-3567 <br />David C. Shelton <br />Director <br />August 10, 1981 <br />Mr. Will Wright <br />~~ Western Fuels Association, Inc. <br />905 Urban Street <br />Suite 305 <br />Lakewood, Colorado 80228 <br />Re: Satisfaction of Stipulations to the Deserado Mine Permit <br />Dear will: <br />The Division has received and reviewed additional information concerning <br />stipulations to the mining permit submitted by Western Fuels or it's <br />consultants. In light of this, the following stipulations have been sat- <br />isfied: <br />1. Stipulation Number 3, <br />/~ <br />2. Stipulation Number' <br />3. Stipulation Number 16, <br />4. Stipulation Number Z7, <br />5. Stipulation Number I8, <br />6. Stipulation Number 20, and <br />7. Stipulation Number 2I. <br />Also, during a conversation with Tommy Raye, it was requested that the time <br />period for submission of information concerning stipulations number 9, 12, <br />22 (a) and 22 (b) be extended. The reason for. this request being that the <br />design of the railroad loop and conveyor system has not been finalized. <br />With this in mind, the time limit for satisfaction of these stipulations has <br />been extended to 180 days from the date of permit issuance, or at least 95 <br />days before construction begins. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.