Laserfiche WebLink
(G) X-2001-217-07 (No bond associated with this NOI.) <br />This NOI consists of disturbance that was permitted as an NOI after the disturbance was <br />completed. There was never any bond associated with it and it was never approved. The <br />disturbance consisted of piezometers installed azound the Bruce Pazk Dam to monitor <br />subsurface water. <br />Ten sites were listed on the 180-day report as having been drilled. Two additional sites <br />were added in subsequent transmittals. <br />(1) BL-101 was abandoned and reclaimed. <br />(2) BS-102 was transferred to the permit by MR-45. <br />(3) BD-103 was transferred to the permit by MR-45. <br />(4) BD-105 was transferred to the permit by MR-45. <br />(5) BD-lOSA was transferred to the permit by MR-45. <br />(6) BL-102 was transferred to the permit by MR-46. <br />(7) BD-101 was transferred to the permit by MR-45. <br />(8) BD-102 was abandoned and reclaimed. <br />(9) BD-104 was abandoned and reclaimed. <br />(10) BS-104 was abandoned and reclaimed. <br />(11) BL-lOlA was transferred to the permit by MR-46. <br />(12) BL-102A was transferred to the permit by MR-46. <br />(H) X-2002-217-08 (There is no bond associated with this NOI.) <br />This NOI was never approved no disturbance was made and the requested period of <br />exploration now expired. <br />