My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53661
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:08 PM
Creation date
11/23/2007 8:49:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
General Documents
Doc Date
7/22/1999
Doc Name
FINAL ENVIRONMENTAL IMPACT STATEMENT VOLUME 2 APPENDIX I-J-K
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minimizing Impacts within Mining Panels <br />An important goal will be to minimize adverse modification of important mule <br />deer habitat components, specifically higher density pinyon-juniper stands and <br />sagebrush parks. Efforts will be made to maintain the integrity of desirable pockets <br />of higher density pinyon-juniper when laying out roads, pipeline corridors, and <br />well pads within the mining panels. It is thought that avoiding; these pockets will <br />help maintain post-mine winter range utility. Most importantly, it will preserve <br />those habitats that would otherwise be the most difficult to replace through <br />reclamation and rvegetation. <br />To this end, a site review will be carved out by BLM staff prior to any surface <br />disturbance in a mining panel to delineate important habitat components, <br />specifically higher density pinyon-juniper stands. This site review may be <br />accomplished by a combination of inspection of aerial photof;raphy and on-the- <br />ground surveys and would result in habitat delineation and mapping. No surface <br />disturbance in a mining panel will occur until specific clelineation of that <br />disturbance is approved by the BLM. <br />Although not specifically related to mule deer habitat, an ancillary goal of the mule <br />deer habitat delineation effort will be to identify and minimize tree loss of ponderosa <br />pine stands and individuals within the mining panels, particularly large <br />individuals that are reproducing. • <br />Well Field Pipeline Crossings <br />Another goal will be to provide effective mule deer crossings of well field piping. <br />To minimize potential restrictions to deer movement within and through the <br />mining panels, well field piping will be constructed using a system of underpasses <br />and overpasses to allow free movement by deer through the mining panel area. <br />There are indications that, when pipes are elevated 28 inches or more above the <br />ground, deer will readily move under the structures. However, advantage will be <br />taken of topographic features to further facilitate deer and elk movement through <br />the mining panels. Well field piping will be elevated at depressions and drainages <br />and buried in some locations such as at road crossings. <br />Revegetation of Reclaimed Areas <br />Reclamation of disturbed areas will be an important component of mule deer <br />mitigation. Revegetation of areas reclaimed following cessation of mining activities <br />in a portion or all of each mining panel will focus on using species that will be <br />beneficial to wintering deer. Revegetation components will include grasses, forbs, <br />shrubs, and trees. <br /> <br />Wildlife Mitlgation Plan 1-2 <br />~'ankee Gulch Sodium Minerals Project <br />Amenran Soda, LL.P. <br />
The URL can be used to link to this page
Your browser does not support the video tag.