attachment. A legal opinion and mining law explanation from company attorney at Davis <br />Graham & Stubbs was submitted and is on file with Eagle County Planning. <br />Current vs. proposed hours of operation including hours and days? Current <br />and proposed hours remain the same. Trucks begin hauling at 6:30 am and finish the day <br />at 4:OOpm or S:OOpm with a 30-minute lunch break. This amounts to daily hauling time of <br />9-10 hours. Normal schedule is on a Mon-Fri basis. Infrequent disruptions due to weather <br />or equipment breakdowns during the week require the need for an occasional Saturday <br />haul. Experience at the existing mine site indicates this occurs 3-4 times a year. . <br />Environmental Assessment CO-140-2001-064EA provides a detailed analysis <br />showing that the current and future production requirement of 90-100 trucks per day <br />represents less than 2% of all daily vehicle traffic crossing I-70 at the Gypsum overpass. <br />Length of haul road from the proposed mice site/ Paved status of haul road.? <br />The new access road measuring 1.2 miles will intersect the existing haul road at a point 3/< <br />of a mile from County Road #51. The length of the new road will decrease as mining <br />progresses down slope. County Road #51 is treated with dust suppressant from the mine <br />road entrance to the intersection of Highway #6. With the exception of a few steep <br />sections, the mine haul road is also treated with dust suppressant. Treating steep sections <br />presents a safety problem because the dust suppressant agent (lignosite) tends to become <br />slick with rain or snowfall. Untreated sections are controlled with water spray. <br />Number of trucks/ Description of trucks? The fleet consists of five <br />tractor/bottom dump trailer units. The trailers are equipped with automatic tarping units. <br />Stockpile size? Stockpiled ore at the bottom of the mine haul road varies from <br />30,000 tons to 100,000 tons depending on operational requirements. <br />Annual ore tonnage requirement? There will be no requirement to increase <br />mine production from current levels. Maximum production capacity at the wallboard <br />plant will remain at current requirements in the range of 600,000 tons per year. <br />Watering schedule/ amounts of water and dust suppressant used? During dry <br />weather conditions, a 4,000- gallon capacity water truck operates on a continuous basis <br />during hours of operation. It takes approximately 15-20 minutes to load the truck at the <br />plant water supply system and the truck is immediately back on the road. The lignosite <br />dust suppressant is currently purchased and used in the amount of 15,000 gallons per <br />year. This amount will be increased for necessary usage at the amended project. <br />16 <br />