Laserfiche WebLink
~^. .. .w ~ Ili ~ . i~ ~ ~ ~ . ~ •~ r .^~ Sri ~ <br />TABLE 1-1 <br />ENVIRONMENTAL PERMITS AND APPROVALS NEEDED TO CONSTRUCT <br />AND OPERATE THE YANKEE GULCH SODIUM MINERALS PROJECT <br />' <br /> <br />P A rov <br /> <br /> <br />.. <br />e <br />u <br />otiiea <br />A Ucabie 1'ro"ect Co <br />ra <br />Department of Public Health and <br />Environment, Air Pollution Control <br />Division (cont.) <br />Air Quality Construction Permit with Required for emission sources at the All sources and construction activities <br />Prevention of Significant Deterioration commercial processing facilities at both the associated with Proposed Action; each site <br />Review Piceance and Parachute Sites will have its own Construction Permit <br />Air Quality Title V Operating Permit Operating permits are required as a result of [he All sources associated with Piceance and <br /> Federal Clean Air Act Amendments of 1990 for Parachute Sites; each site will have its own <br /> facilities that meet the Title V definition of Title V Permit <br /> "major" sources <br />Uepartment of Public Health and <br />Environment, Division of Water Quality <br />Control <br />Industrial Storm Water Discharges During To ensure that stormwater discharges from the Construction of the Piceance and Parachute <br />Construction site during construction are adequately managed Sites <br />Industrial Storm Water Discharges for Mining To ensure that stonnwater discharges from the Operation of the Piceance and Parachute <br />and Processing site during project operation are adequately Sites <br /> managed <br />Department of Natural Resources, Division <br />of Water Resources <br />Water Rights Legal appropriation of water in the State of Surface water and/or groundwater used by <br /> Colorado the project for mining and processing <br />Sheet 3 of 4 <br />