My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53629
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53629
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:07 PM
Creation date
11/23/2007 8:47:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
General Documents
Doc Date
1/19/1999
Doc Name
MEMO DRAFT ENVIRONMENTAL IMPACT STATEMENT
From
STEIGERS CORP
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~^. .. .w ~ Ili ~ . i~ ~ ~ ~ . ~ •~ r .^~ Sri ~ <br />TABLE 1-1 <br />ENVIRONMENTAL PERMITS AND APPROVALS NEEDED TO CONSTRUCT <br />AND OPERATE THE YANKEE GULCH SODIUM MINERALS PROJECT <br />' <br /> <br />P A rov <br /> <br /> <br />.. <br />e <br />u <br />otiiea <br />A Ucabie 1'ro"ect Co <br />ra <br />Department of Public Health and <br />Environment, Air Pollution Control <br />Division (cont.) <br />Air Quality Construction Permit with Required for emission sources at the All sources and construction activities <br />Prevention of Significant Deterioration commercial processing facilities at both the associated with Proposed Action; each site <br />Review Piceance and Parachute Sites will have its own Construction Permit <br />Air Quality Title V Operating Permit Operating permits are required as a result of [he All sources associated with Piceance and <br /> Federal Clean Air Act Amendments of 1990 for Parachute Sites; each site will have its own <br /> facilities that meet the Title V definition of Title V Permit <br /> "major" sources <br />Uepartment of Public Health and <br />Environment, Division of Water Quality <br />Control <br />Industrial Storm Water Discharges During To ensure that stormwater discharges from the Construction of the Piceance and Parachute <br />Construction site during construction are adequately managed Sites <br />Industrial Storm Water Discharges for Mining To ensure that stonnwater discharges from the Operation of the Piceance and Parachute <br />and Processing site during project operation are adequately Sites <br /> managed <br />Department of Natural Resources, Division <br />of Water Resources <br />Water Rights Legal appropriation of water in the State of Surface water and/or groundwater used by <br /> Colorado the project for mining and processing <br />Sheet 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.