Laserfiche WebLink
1~ <br />list of Tables, Figures and Appendices <br />Table 4.2-1 Acres of Soil Disturbance -Proposed Action <br />Table 4.2-2 Acres of Soil Disturbance -Accelerated Development Altemative <br />Table 4.5-1 Maximum Estimated Annual Operation Emissions, Piceance and <br /> Parachute Sites <br />Table 4.5-2 Significant Impact Area and de Minimum Monitoring Analysis <br />Table 4.5-3 Summary of Piceance Cumulative Air Quality Standards Analysis <br />Table 4.5-4 Summazy of Parachute Cumulative Air Quality Standazds Analysis <br />Table 4.5-5 Class I Significant Impact Analysis <br />Table 4.5-6 Summary of Cumulative Class II Increment Analysis for the Pi<;eance <br /> Site <br />Table 4.5-7 Summary of Cumulative Class II Increment Analysis for the Parachute <br /> Site <br />Table 4.5-8 Accelerated Development at Piceance Air Quality Standards Ar.~alysis <br />Table 4.5-9 Accelerated Development at Pazachute Air Quality Standazds Analysis <br />Table 4.5-10 Accelerated Development Alternative -Class II Increment Analysis for <br /> Piceance Site <br />Table 4.5-11 Accelerated Development Altemative -Class II Increment Analysis for <br /> Parachute Site <br />Table 4.6-1 Colorado Permissible Ambient Noise Standards <br />Table 4.6-2 Estimated Noise Levels 50 Feet from Source <br />Table 4.7-1 Acres of Vegetation Disturbance -Proposed Action <br />Table 4.7-2 Acres of Vegetation Disturbance -Accelerated Development Altemative <br />Table 4.15-1(a) Construction-Phase Traffic Impacts on Roads Serving the Project Area <br />Table 4.15-1(b) Operations-Phase Traffic Impacts on Roads Serving the Project .Area <br />Table 6-1 List of Agencies, Organizations and Individuals Contacted for the Draft <br /> EIS <br />Table 6-2 List of BLM Interdisciplinary (ID) Team <br />Table 6-3 List of Draft EIS Prepazers <br />List of Figures <br />Figure 1-1 Regional Setting of the Project and Location of Project Facilities <br />Figure 2-la-h Project Location <br />Figure 2-2 Piceance Site Well Field Layout <br />Figure 2-3 Typical Well Field Layout, 0-5 Yeaz Mine Panel <br />viii <br />