Laserfiche WebLink
<br /> <br />Memo to Berhan Keffelew - 2 - <br />June 16, 1992 <br />5) The approved mine plan page 3, Exhibit E- Reclamation Plan states <br />that "Where ample overburden is available highwalls will be <br />eliminated" Holnam should provide the Division with a map showing <br />where the highwalls will be eliminated and where they will not. <br />Where they will not a plan must be provided describing what slopes <br />they will be reclaimed to, the methods to be used, and the volumes <br />of material required. Across section of these areas is also <br />necessary in order to calculate the bond. <br />6> It is not possible to calculate financial warranty costs from the <br />current maps, the Division must be provided with maps and <br />supplementary information for each area, which shows the volume of <br />material to be used during final grading, the source of the fill <br />material and the average transport distance for the material. <br />GRS/yob <br />cc: Carl Mount <br />3602E <br />