Laserfiche WebLink
1 <br />Page 2 <br />Work next year, or perhaps in the late fall of this year if <br />weather allows, will commence with the construction of the 12th <br />check dam and proceed down the draw until all 23 are finished. <br />It is anticipated that we will continue building lower sections <br />of terraces as they are intersected for access into the draw. <br />After the check dams are finished we will proceed with Phase 3 of <br />the project which will be construction of the 14 terraces to a <br />point as high on the ridge as possible without interfering with <br />West Ridge final grading at the top of the ridge. <br />Should you have any questions <br />contact me at the mine site. <br />regarding this material, please <br />Sincerely, <br />David Beverlin <br />Resident Engineer <br />cc: Terry Crowner - Edna Mine <br />Brian Gontarek - Englewood Office <br />