Laserfiche WebLink
iii iiiiiiiiiiiu ~~i <br />999 <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />I J 13 Sherman $L, Room 21 S <br /> <br />Denver, Colorado N0203 ~~~~~ <br />Phone: 17031 P66 3567 <br />FA%.(30]18)2-A106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCES <br />December 19, 1995 <br /> Roy Romer <br /> Governor <br />Michael G <br />Altavilla lames 5. Luchhead <br />. <br />Engineering Manager Ececmive Direao~ <br /> <br />h <br />l <br /> <br />Seneca Coal Company Ma <br />B lung <br />ae <br />Divivon Dirraor <br />P.O. Drawer D <br />Hayden, Colorado 81639 <br />RE: Yoast Mine (C-94-082) <br />Stipulation No. 5 <br />Dear Mr. Altavilla: <br />We have received your request for an extension of the due date for submittal, as required by <br />Stipulation No. 5 on the Yoast Permit, of revised Pond 11 designs. The basis of your request <br />is reasonable; the Division will allow the extension. The due date for the submittal is now <br />August 3, 1996. <br />Please be advised, though, that it is imperative that Seneca submit the designs well in advance <br />of the expected construction date, and at a time when a field investigation could be conducted. <br />Otherwise, Seneca may experience a delay in construction of the pond, as was the case with the <br />haul road and Pond 10. <br />If you or your staff have questions or need additional information, please contact me. <br />Sincerely, <br />Susan L Burgmaier <br />Environmental Protection Specialist <br />SLB\121995B.WP <br />