My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53501
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53501
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:39:01 PM
Creation date
11/23/2007 8:40:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
General Documents
Doc Date
5/12/1997
Doc Name
BOWIE 1 MINE PN C-81-038
From
DMG
To
BOWIE RESOURCES LIMITED
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
William Beaz, Jr. -2- January 14, 1997 <br />Bowie Resources Limited <br />3. The Division may publish notice and notify you that your required performance bond will <br />be reduced to account for the removal of costs associated with coal stockpile disposal, <br />pursuant to Rule 3.02.2(4). If the reclamation cost estimate for your mine is incorporated <br />into your permit application, a revision to the permit would be required to update the <br />approved cost estimate. If the cost estimate for your mine is sepazate from the permit <br />application, no revision of the permit would be required. <br />While costs for disposal of coal stockpiles will no longer be included in estimates of reclamation <br />cost liability, other costs which the State would be likely to incur during reclamation of coal <br />storage azeas at permit-revoked sites will continue to be included in Division cost estimates. <br />These include costs for clean up and disposal of coally material in the footprint of any coal <br />storage facilities, costs for laboratory analysis of mine waste to verify that the material is suitable <br />for on-site disposal, and costs for proper disposal of any coal materials which are stored for <br />extended periods of time without being sold. <br />Please contact the lead specialist for your mine if you have questions or need additional <br />information. They will be happy to discuss your choice of administrative procedures to adjust <br />the required performance bond for your mine. <br />Sincerely, <br />~~~~~ <br />Susan J. McCannon <br />Coal Program Supervisor <br />cc: coal staff <br />m:~roaNpr~bonding <br />
The URL can be used to link to this page
Your browser does not support the video tag.