Laserfiche WebLink
<br /> <br />HYDROLOGIC REGIME AND ASSOCIATED NATURAL RESOURCES ARE NOT ANTICI- <br />PATED. THESE ADDITIONAL ITEMS, HOWEVER, SHOULD BE SUBMITTED BY THE <br />PERMITTEE TO THE DIVISION TO MORE ADEQUATELY ADDRESS CERTAIN ISSUES. <br />1. THE PERMITTEE SHALL SUBMIT BY FEBRUARY 21, 1994 A MORE PRECISE <br />DEFINITION OF THE EFFECTS OF LONGWALL MINING SUBSIDENCE ON THE <br />SURFACE WATER AND GROUNDWATER SYSTEMS; <br />2. THE PERMITTEE SHALL SUBMIT BY MARCH 21, 1994 AN ANALYSIS OF THE <br />PREDICTIONS WITH REGARD TO THE HYDROLOGIC BALANCE MADE IN THE <br />PERMITTEE'S AUGUST 12, 1980 WATER, WASTE AND LAND, LTD. HYDROLOGY <br />REPORT. THIS ANALYSIS SHALL BE DERIVED FROM DATA OBTAINED IN <br />CONJUNCTION WITH THE CURRENTLY APPROVED HYDROLOGIC MONITORING <br />PLAN ESTABLISHED PURSUANT TO RULES 2.05.61311b11iv1 'AND 4.05.13. <br />3. THE PERMITTEE WILL SUBMIT TO THE DIVISION BY MARCH 21, 1994 A MORE <br />DETAILED ANALYSIS OF THE STABILITY OF THE PERMANENT ENTRY SEALS <br />AND DOWNSLOPE BARRIERS, PURSUANT TO RULE 2.05.61311c1, WITH REGARD <br />TO HYDRAULIC HEADS ANTICIPATED AS THE MINE INUNDATES. <br />Stipulation No. 53 <br />THE PERMITTEE WILL SUBMIT TO THE DIVISION BY APRIL 21, 1994 A COMPREHENSIVE <br />TECHNICAL REVISION WHICH ADEQUATELY ADDRESSES: <br />APPROPRIATE TOPSOIL REPLACEMENT REQUIREMENTS AND AN ADEQUATE <br />TOPSOIL MASS BALANCE ANALYSIS; <br />MORE APPROPRIATE REVEGETATION SUCCESS STANDARDS, BETTER DEFINED <br />VEGETATION SAMPLING METHODOLOGY, AND MORE APPROPRIATE <br />REVEGETATION SEED MIXES. <br />STATUS OF STIPULATIONS <br />The following is a list of stipulations that are still active: <br />Stipulation No. 21461 <br />IMMEDIATELY FOLLOWING STREAM CHANNEL RELOCATION CONSTRUCTION AND <br />BEFORE RE-ROUTING THE PURGATOIRE RIVER BACK INTO ITS PERMANENT BANKS, THE <br />PERMITTEE MUST COMPLETE A SURVEY OF THE NEWLY CONSTRUCTED CHANNEL. <br />THE COMPONENTS OF THE SURVEY ARE DETAILED BELOW. <br />EACH FOLLOWING YEAR, DURING THE MONTH OF FEBRUARY (COINCIDING WITH LOW <br />FLOW(, THE PERMITTEE MUST RE-SURVEY ALL OF THE FOLLOWING REQUIRED <br />COMPONENTS OF THE CHANNEL AND SUBMIT THIS INFORMATION TO THE DIVISION BY <br />MAY 1 OF EACH YEAR. <br />FIVE CROSS-SECTIONAL SURVEYS OF THE STREAM RELOCATION, TO BE <br />AGREED UPON BY THE DIVISION PRIOR TO THE SURVEY. <br />2. A LONGITUDINAL PROFILE OF THE STREAM BED FROM 50 FEET ABOVE THE <br />BRIDGE CROSSING THE PURGATOIRE RIVER, EXTENDING TO 100 FEET BELOW <br />THE STREAM RELOCATION SECTION. <br />2 <br />