Laserfiche WebLink
_ Mining Plan Approval Document No. Co-0021 <br />• Page 2 of 4 <br />3. The operator shall conduct coal development and mining <br />operations only as described in the complete permit <br />application package, and approved by the Colorado Mined Land <br />Reclamation Division, except as otherwise directed in the <br />conditions added to this mining plan modification approval. <br />The operator shall comply with the terms and conditions of <br />the leases, this mining plan modification approval, the <br />special conditions appended hereto as Attachment B, and the <br />requirements of the Colorado Permit number C-80-007 issued <br />under the Colorado State program, approved pursuant to the <br />Surface Mining Control and Reclamation Act of 1977 (30 <br />U.S.C. 1201 et sec.). <br />This mining plan modification approval shall be binding on <br />any person conducting coal development or mining operations <br />under the approved mining plan and shall remain in effect <br />until superseded, cancelled, or withdrawn. <br />6. If during mining operations unidentified prehistoric or <br />historic resources are discovered, the operator shall ensure <br />that the resources are not disturbed and shall notify <br />• Colorado Mined Land Reclamation Division and the Office of <br />Surface Mining Reclamation and Enforcement (OSM). The <br />operator shall take such actions as are required by Colorado <br />Mined Land Reclamation Division in coordination with OSM. <br />(~- ~ _ <br />A 'stant Secretary--La d an inerals anag Date <br />• <br />