Laserfiche WebLink
III. Summary of Revisions which have occurred since the Permit Renewal was <br />issued May <br />Minor Revision 2: Round trip transportation of D-10 across reclaimed land. <br />Action: Approved May 26, 1987. <br />Permit Revision l: Reduction of permit area to reflect termination of <br />leases and no disturbance. <br />Action: In review, submitted December 8, 1989. <br />IV. Bonding <br /> <br />The Division has reviewed both the amount and conditions for the bond at <br />the Canadian Strip Mine. Two Phase I Bond Release actions have occurred: <br />one was approved on July lu, 1981 and the other was approved on <br />December 19, 1988. The loadout in Walden was given full' release as part <br />of the December 19, 1988, bond release action. Phase I Bond Release has <br />now been granted for all parts of the disturbed area at the mine. The <br />current bond is 5298,580,00 and is adequate to cover further reclamation <br />at the mine. <br />/ ern <br />5001E <br />-6- <br />