Laserfiche WebLink
27. Please submit a minor revision to address the placement of a flow <br />meter on the Sanborn Creek Mine dewatering pipeline. Include in <br />this revision a commitment to monitor the amount, duration and <br />location of significant inflow events encountered during the mining <br />process and to report these data to the Division as they occur and <br />in a summary contained in the Annual Mine Inflow Report. <br />Permit Boundary <br />28. Please submit a Technical Revision addressing an incidental boundary <br />change to include the culvert outfall and riprap channel located south of <br />the railroad tracks adjacent to the Sanborn Mlne portals. <br />SECTION VI - BONDING SUMMARY AND RECOMMENDATION TO REQUIRE ADDITIONAL 80ND <br />The Division is currently reviewing Somerset Mining Company's reclamation bond <br />for the Somerset and Sanborn Creek Mines. This review is expected to be <br />complete in two to three weeks and will be sent to Somerset Mining Company <br />under separate cover at that time. <br />555/bjw/3464F <br />-~- <br />