Laserfiche WebLink
Mdp No. Description <br />6H-379A Structure Contours <br />6L-178 Correlation along Structure Sections <br />6L-179 Correlation along Structure Sections <br />6L-180 Correlation along Structure Sections <br />6L-181 Correlation along Structure Sections <br />A8-1367-1 Portal Reclamation <br />E8-3262 Hydrologic Soil Map <br />ES-3391 1 of 3 - Vegetation Map <br />ES-3391 2 of 3 - Vegetation Map <br />E8-3298 Drill Hole Locations <br />E8-3362 Proposed Underground Permit Boundary <br />E8-3278A Pond No. 8 Details <br />Map 14 Temporary Impoundment - East Bench <br />19. Change page designations on the following so they do not duplicate <br />written document page numbers: CS-1195A, C8-1196A, CS-1197A, CS-1198A, <br />CS-1190 and CS-1191. <br />Reclamation Schedule for Somerset Mine Offsite Facilities <br />20. In order to remain in compliance with Rule 4.13 and 4.14.1(d), please <br />submit, in the form of a Technical Revision, a schedule for timely <br />reclamation of the upper and lower Hubbard Creek facilities areas, the <br />Bear Canyon ventilation areas and their associated roads and power lines. <br />21. Please provide documentation of the PCB concentration amount and weight <br />of the fluid contained in the remaining transformers at the Bear Canyon <br />substation. This information i5 not clear in the documents you provided <br />earlier this year. <br />22. Several items listed on the October 1979 PCB inventory list are not <br />included on the 1980 list. Please provide PCB concentration fluid weight <br />and volume data for these items listed below or provide an explanation as <br />to why the data is no longer relevant. The missing information relates <br />to the following items listed by their respective sample numbers: <br />S-O1 5-09 5-20 5-32 <br />5-02 5-10 5-28 5-45 <br />5-03 5-13 5-29 5-46 <br />5-07 5-18 5-30 5-47 <br />5-08 5-19 5-31 <br />23. The remaining portal collars at the Bear and Hubbard Creek vent <br />facilities need to be removed unless regrading can achieve the approved <br />post mine contours for each area without removal of the collars. <br />Revegetation Practices <br />24. Some concerns have been identified in the Revegetation Practices section <br />of Appendix H in the permit document. These concerns and some <br />suggestions are listed below: <br />-5- <br />