My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL53183
DRMS
>
Back File Migration
>
General Documents
>
GENERAL53183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:38:49 PM
Creation date
11/23/2007 8:24:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
General Documents
Doc Date
4/16/1982
Doc Name
PROPOSED DECISION
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3. THE APPLICANT MUST SUBMIT TO THE DIVISION AN ANNUAL REPORT <br />CHARACTERIZING THE INFLOWS, DISCHARGES AND THE CONSUMPTION OF WATER <br />WITHIN THE MINE. THIS REPORT IS TO INCLUDE A MINE WORKING MAP <br />SHOWING THE LOCATION AND QUANTITY OF INFLOWS; A TABLE KEYED TO THE <br />MINE MAP WHICH SHALL CONTAIN THE SOURCE (i.e. FAULT, FRACTURES, <br />~ ETC.), QUANTITY, DURATION, AND QUALITY (i.e. pH, <br />ELECTRO-CONDUCTIVITY AND TEMPERATURE) OF ALL NON-SEEP INFLOWS; A <br />o--~ TABLE CONTAINING RECORDS OF WATER DISCHARGED FROM THE MINE, <br />p CONSUMED IN THE MINE AND IMPORTED FOR USE WITHIN THE MINE; A <br />DISCUSSION OF THE WATER BALANCE WITHIN THE MINE; AND, A PROJECTION <br />OF HYDROLOGIC IMPACTS OF MINING IN THE UPCOMING YEAR. <br />4. A) THE APPLICANT WILL CONTINUE MONITORING WELLS GW-1 AND GW-4 IN <br />SALT CREEK ALLUVIUM QUARTERLY. AT THESE TIMES THE WATER LEVEL IN <br />THE WELLS WILL BE MEASURED AND SAMPLES WILL BE TAKEN FOR ANALYSIS <br />OF pH, TEMPERATURE AND SPECIFIC CONDUCTANCE. THE RESULTS OF THIS <br />~~ MONITORING WILL BE SUBMITTED TO THE DIVISION IMMEDIATELY AFTER DATA <br />COLLECTION AND ANALYSIS. <br />s~ <br />,~ B. THE REQUIREMENTS OF THIS STIPULATION ARE SUSPENDED BY THE <br />DIVISION ONLY FOR SUCH PERIOD OF TIME THAT THE OPERATION IS UNDER A <br />DIVISION APPROVEO TEMPORARY CESSATION OF OPERATIONS AND NO <br />ADDITIONAL DISTURBANCES ARE CREATED. <br />5. WITHIN 60 DAYS ,OF PERMIT ISSUANCE THE APPLICANT MUST PROVIDE AN <br />ADDITIONAL ANALYSIS OF THE FILL AND ANY OTHER DISTURED MATERIAL <br />WHICH WILL NOT BE TOPSOILED PRIOR TO REVEGETATION. THIS SHALL <br />CONSIST OF A SINGLE COMPOSITE SAMPLE OF THE SURFICIAL 6 INCHES OF <br />MATERIAL TAKEN FROM SEVERAL LOCATIONS ON THE BENCH. THE SAMPLE <br />SHALL BE ANALYZED, AT A MINIMUM, FOR pH, ELECTRICAL CONDUCTIVITY <br />AND SODIUM ADSORPTION RATIO. IF THE ANALYSIS INDICATES THAT THE <br />MATERIAL IS NOT SUITABLE AS PLANT GROWTH MEDIUM, THE APPLICANT <br />SHALL REVISE THE PERMIT APPLICATION TO PROVIDE AN APPROVABLE PLAN <br />FOR SELECTIVE HANDLING AND ISOLATION OF THE UNSUITABLE MATERIAL <br />DURING REGRADING OPERATIONS. THE PLAN SHALL BE SUBMITTED TO THE <br />DIVISION WITHIN 60 DAYS FOLLOWING SUBMITTAL OF THE FILL MATERIAL <br />ANALYSIS. <br />TOPSOIL MUST BE ANALYZED FOR FERTILIZER ELEMENTS (N,P,K) PRIOR TO <br />SEEDING. IF THE SOIL IS FOUND TO BE PHOSPHOROUS DEFICIENT, <br />PHOSPHOROUS MUST BE INCORPORATED INTO THE TOPSOIL DURING THE <br />RESPREADING PROCESS. ANY OTHER FERTILIZER ELEMENTS WHICH ARE <br />DEFICIENT IN THE TOPSOIL SHALL BE ADDED AFTER ONE YEARS GROWTH OF <br />VEGETATION AT A TIME OF YEAR APPROVED BY THE DIVISION. <br />7. WITHIN 60 DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST REVISE THE <br />APPLICATION TO PROVIDE A STATEMENT THAT THE COMBINED McCLANE CANYON <br />MINE AND MUNGER CANYON MINE PRE-MINE DATA FOR PRODUCTIVITY FOR THE <br />GREASEWOOD SHRUBLAND, SHAD SCALE SHRUBLAND, AND JUNIPER WOODLAND <br />PLANT COMMUNITIES WILL BE UTILIZED FOR THE DETERMINATION OF <br />REVEGETATION SUCCESS (PRODUCTIVITY COt4PONENT) IN ACCORDANCE WITH <br />THE CRITERIA ESTABLISHED UNDER RULE 4.15.8(3)(b). <br />-III- <br />
The URL can be used to link to this page
Your browser does not support the video tag.